According to their definition of Renewable Energy, only "qualified hydropower" counts. This they define as:
Or
It doesn't explicitly say that it includes new hydro plants. Does anyone know why? I'm sure if I dig into it enough I'll find the answer, but I'm just wondering if anyone already knows.
The definition for Qualified Hydropower is on page 10 of the full draft. Pdf is here.
Quote:
Electricity generated solely from increased efficiency achieved, or additions of capacity made, on or after Jan 1 2001 at a hydroelectric facility placed in service before that date.
Or
Quote:
Adding electricity to a dam that did not already have electricity generating capacity (e.g. a dam that's being used only for flood control).
It doesn't explicitly say that it includes new hydro plants. Does anyone know why? I'm sure if I dig into it enough I'll find the answer, but I'm just wondering if anyone already knows.
The definition for Qualified Hydropower is on page 10 of the full draft. Pdf is here.


